Search Results by Category
AI NavigatorAll information related to {{ key_word }}.
AI Navigation will guide you. Click here for information about {{ key_word }}.
2
2
2
2
2
2
2
4
4
1
1 - 20 of 609 results
Irizar e-mobility, Aduna Plant[Spain]
, the first European electromobility plant, located in the town of Aduna, Gipuzkoa. Irizar has invested EUR 75 million in this plant, It has a gross floor area of 18,000 m2 and set on a plot of almost 4 hectares. The plant will not only manufacture electric buses, but also other types of industrial vehicles that complement the electromobility needs of cities. The new plant produces 10.8m and 12m-long city buses, 18m-long articulated buses and wil...
OEM Plants Updated at: 2025/12/20
BYD India, Sriperumbudur Plant[India]
BYD India, Sriperumbudur Plant EV e6 eMPV (2022-2024), EV ATTO 3 eSUV (2022-), EV eMAX 7 MPV (2024-); Bus chassis (2016-); Drive batteries for buses BYD's passenger vehicle plant in India, started production in 2022 - 2016: Started supplying batteries and bus chassis to Olectra Greentech Ltd. - Cumulative investment in India: USD 200 million - Established in March 2007 BYD India, rolls out first ATTO 3 electric SUV from its Chennai plant BYD I...
OEM Plants Updated at: 2025/12/19
Mahindra & Mahindra Ltd.[India]
Mahindra & Mahindra Ltd. Mahindra Group's headquarters ・Total Employees - 78,756(As of 2025) Mahindra & Mahindra Ltd.'s Output : Vehicle 445,119 units (2023) (Passenger vehicles, 3 wheelers are not included) Vehicle 340,327 units (2022) Vehicle 213,190 units (2021) Vehicle 142,818 units (2020) Vehicle 241404 units (2019) Vehicle 272,681 units (2023) (Commercial vehicles) Vehicle 264,635 units (2022) Vehicle 174,119 units (2021) Vehicle 163...
OEM Plants Updated at: 2025/12/19
Ashok Leyland Ltd.[India]
Ashok Leyland Ltd. Headquarter of Ashok Leyland Ashok Leyland Ltd.'s Output : Engine 134,603 units (2015) Vehicle 193,470 units (2024) Vehicle 198,879 units (2023) Vehicle 185,180 units (2022) Vehicle 125,022 units (2021) Vehicle 79,504 units (2020) Vehicle 150,786 units (2019) Vehicle 203,431 units (2018) Vehicle 160,208 units (2017) Vehicle 145,434 units (2016) - No. of employees - 9,695(As of 2025) - Ashok Leyland was established in 1948 a...
OEM Plants Updated at: 2025/12/19
Renault Nissan Automotive India (RNAIPL), Oragadam (Chennai) Plant[India]
2017) - Initial investment: INR 45 billion (USD 0.7 billion) - Production started in 2010. Renault suspends production of Kwid compact car in India due to engine problems Renault-Nissan India to shut plant for regular maintenance Renault India, upgrades its entire vehicle range to BS VI Step 2 emission norms Renault and Nissan announce new investment and vehicles in India Renault-Nissan plant signs settlement ag...
OEM Plants Updated at: 2025/12/19
Mahindra Last Mile Mobility Limited (MLMML), Bengaluru plant (formerly Mahindra Electric Mobility Limited (MEML)) [India]
V (2016- 2023); Van EV eSupro (2016-2019); Electric 3-wheeler: Treo, Treo Yaari (2018-), Treo Zor (2020-); Lithium-ion battery packs, Power electronics, Motor assembly, Battery modules (planning); Mahindra's Last Mile Mobility (LMM) division, manufactures three and four wheelers passenger and cargo vehicles - Production Capacity (year): Lithium-ion battery modules: 500,000 units (planning) - 2012: Start of production - 2018: Announced collaborat...
OEM Plants Updated at: 2025/12/19
Mahindra Defence Systems Limited[India]
Mahindra Defence Systems Limited Light military vehicles Mahindra's Defence system Land Systems unit plant - 2012: Acquired by Mahindra, name changed to Mahindra Defence Systems Limited - 2009: Inaugurated the Mahindra Special Military Vehicles (MSMV) facility at Prithla in Faridabad, NCR Mahindra announces suspension of manufacturing across India due to coronavirus Mahindra wins major contract for defence vehicles Mahindra annouced that it...
OEM Plants Updated at: 2025/12/19
Mahindra Last Mile Mobility Limited (MLMML), Haridwar plant (formerly Mahindra Automotive, Haridwar Plant)[India]
Mahindra Last Mile Mobility Limited (MLMML), Haridwar plant (formerly Mahindra Automotive, Haridwar Plant) Bolero (2006-), Scorpio (-2022); Gio (2010-2015); Three-wheelers, Electric three-wheelers: e-Alfa, e-Treo Mahindra's plant, Mahindra Last Mile Mobility (LMM) for passenger vehicles and mall commercial electric vehicles - Mahindra Last Mile Mobility (LMM) will produce Electric Vehicles at this plant - Start of production - 2006 Mahindra Aut...
OEM Plants Updated at: 2025/12/19
Mahindra Last Mile Mobility Limited (MLMML), Zaheerabad plant (formerly Mahindra Automotive, Zaheerabad Plant)[India]
-), Jeeto (2015-); Buses: Cruzio (2019-) ; 3-wheelers, Tractors; Engine for Jeeto, LCV axle; EV 3 wheelers (planning), EV 4 wheelers (planning), Drive battery packs (planning), Electronic and drivetrain components (planning); Mahindra's plant, Mahindra Last Mile Mobility (LMM) will produce Electric Vehicles and the parts in this location. - Investment amount: INR 10 billion (2023-2029) - On April 24, 2023, Mahindra Last Mile Mobility (LMM) annou...
OEM Plants Updated at: 2025/12/19
Mahindra Automotive, Nashik (Satpur) Plant[India]
th 100% Renewable Energy and in a water positive set-up Mahindra, India Scorpio SUV crosses 900 thousand units production milestone Mahindra, India achieves 100 thousand production milestone for 'all-new' Bolero MaXX Pik-Up Mahindra launches BS-VI version of the XUV300 Mahindra produces 2.5 million vehicles from Nashik plant Mahindra announces suspension of manufacturing across India due to coronavirus Mahindra to cut production due to Coronavir...
OEM Plants Updated at: 2025/12/19
Mahindra & Mahindra Limited, Automotive Division, Kandivali plant[India]
Mahindra & Mahindra Limited, Automotive Division, Kandivali plant MAXX pick-ups & soft tops (-2010), Off-road SUV Thar (-2020), Bolero Maxi Truck Plus (2013-), Bolero Pick-Up Flat Bed (2013-), Imperio (2016-2024), Bolero Camper (2019-); Axle, transmission and engine; Mahindra's passenger vehicles plant, also manufacturers tractors, utility vehicles, and power generators - April 2025: Mahindra expands its new India Design Studio (MIDS) in Kandiv...
OEM Plants Updated at: 2025/12/19
Mahindra and Mahindra limited, Chakan plant [India]
imo ( -2017), Supro, Genio (-2015), Imperio (2016-2024), KUV100 (2016-2023), Alturas G4 (2018-2022), SUV XUV700 (2021-), Scorpio-N (2022-), Supro CNG Duo (2023-), Veero LCV (2024-), EV BE 6 SUV (2024-), EV XEV 9e SUV (2024-), EV XEV 9S (2025-), Global Pik Up (2026-planning); Intermediate Commercial Vehicle: FURIO (2018-); Heavy Commercial Vehicle: BLAZO X (2018-); Ssangyong Rexton (2012-2018); EV, e-motors, controllers, battery packs, EV componen...
OEM Plants Updated at: 2025/12/19
Volkswagen Autoeuropa Ltd., Setubal, Palmela Plant (formerly AutoEuropa Automoveis, Ltda.)[Portugal]
red shifts VW Group faces production disruptions across multiple plants due to Slovenia floods VW Autoeuropa plant to resume normal operations and expand workforce VW's Portugal plant reaches agreement on lay-offs and production stoppages VW Autoeuropa celebrates production of four millionth vehicle at Palmela Plant, Portugal Volkswagen Autoeuropa reaches in 2024 the highest volume of post-pandemic production Volkswagen to produce ID. EVER...
OEM Plants Updated at: 2025/12/19
Stellantis, Vauxhall Motors Ltd., Luton plant (Former GM Manufacturing, Luton plant)[UK]
mpy, Fiat E-Scudo (all 2025 - transferred to Ellesmere Port plant); Renault Trafic (2001-2014); Vauxhall's van assembly plant, all production transferred to the Ellesmere Port plant and closed on March 2025. - The plant was officially closed on March 2025 - Production Capacity during Operations : Vehicle 100,000 units (3 shifts) - Number of Employees: 1,100 (as of Mar. 2025) - November 2024, announced that all production will be transferred to ...
OEM Plants Updated at: 2025/12/19
OAO UAZ (Ulyanovsky Avtomobilny Zavod), Ulyanovsk Plant[Russia]
implement the production of LCV Argo). 2025: RUB 1.1 billion for new pressing line. - In March 2022, stopped production of Isuzu branded cars. - In 2012, resumed production of Isuzu brand. - UAZ (Ulianovsk Automobile Plant) was established in August 1941. The first self-developed commercial vehicle was introduced in 1954. In 1992 the company was restructured into an open joint-stock company "Ulyanovsky Avtomobilny Zavod". UAZ dev...
OEM Plants Updated at: 2025/12/19
GAZ, Nizhny Novgorod Plant[Russia]
GAZ, Nizhny Novgorod Plant Trucks - GAZ Trucks, Valdai NEXT, GAZon Next (medium-duty truck, 2014-), Valdai (-2015), Valdai 8, GAZelle Business (2010-), Sadko NEXT, GAZelle NEXT, Sobol, Sobol NN (GAZelle NN Light) (2022-), Sobol business, Valdai 18 (2025-); Buses and minibuses - GAZelle e-NN EV (2021-), GAZ Gazelle NEXT, GAZ Sobol, GAZelle NN (2021-), GAZelle NEXT (2013-), GAZelle City (2020-), Sobol; Volga Brand Cars (2026-Planning); Mercedes-...
OEM Plants Updated at: 2025/12/19
Mercedes-Benz do Brasil Ltda, Daimler Truck, São Bernardo do Campo Plant[Brazil]
Axor, Actros (2020-), Accelo (2016-), Arocs (2021-); Bus chassis: EV eO500U (2022-), O 500 RS 2045 4x2 (2025-), O 500 RSD 2548 6x2 (2025-); Engines, Transmissions, Axles Commercial truck and bus assembly plant - The output number corresponds to ANFAVEA’s registrations of nationally manufactured vehicles. - Investment: 2018–2022: BRL 2.4 billion for São Bernardo do Campo and Juiz de Fora (digital manufacturing, next-generation trucks, ...
OEM Plants Updated at: 2025/12/19
Jaguar Land Rover, Halewood Plant[UK]
port PHV (2021-), Discovery Sport EV (Planning); Range Rover Evoque (2011-), Evoque MHV (2019-), Evoque PHV (2020-); EMA architecture-based Range Rover (2026-planning); SUV assembly plant - Number of Employees- 3,500 (as of September 2025). - Investment: 2023: GBP 500 million for electric vehicle production preparations. - This site became Jaguar plant in 2000. - Operation started in 1962 by Ford Motor Company. JLR has been named th...
OEM Plants Updated at: 2025/12/18
Ebro Factory, Zona Franca, Barcelona Plant (former Nissan Motor Ibérica S.A. Zona Franca Plant)[Spain]
” a joint venture between EV Motors and Chery Automobile, started operations at the former Nissan plant in Barcelona’s Zona Franca in late 2024. - Number of Employees: 1,000 (as of November 2025). - Investment: ・2024-2029: Chery will invest EUR 400 million for the production of Omoda vehicles. -2023–2024: QEV and Btech began reindustrializing the former Nissan Zona Franca plant, launching the D-Hub and preparing EV production ...
OEM Plants Updated at: 2025/12/18
Jaguar Land Rover, Castle Bromwich Plant[UK]
Jaguar Land Rover, Castle Bromwich Plant Jaguar XK grand tourer(1996-2014), XJ (-2019), XF, XF Sportbrake (2017-2024), XE (2016-2024), XF MHV (2020-2024), XE MHV (2020-2024); Jaguar F-TYPE Coupe (2013-2024); Pressed body metal Jaguar Passenger car assembly plant, pressed body metal plant. Vehicle assembly ended in May 2024. - Investment: 2025: GBP 41 million for new SVO facilities and GBP26 million to replace existing paint booths wi...
OEM Plants Updated at: 2025/12/18
AI Navigator




Japan
USA
Mexico
Germany
China (Shanghai)
Thailand
India