Search Results by Category

All information related to {{ key_word }}.
AI Navigation will guide you. Click here for information about {{ key_word }}.










1 - 20 of 1314 results
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly)[USA]
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly) Chevrolet Equinox (2012-2015); Cadillac XT5, XT5 HV (2016-), XT6 (2019-end of 2025 planning), EV Lyriq (2022-), EV Vistiq (2025-); GMC Acadia (2016-), Holden Acadia (2018-2019); EV Acura ZDX (2024-), ZDX Type S (2024-); Chevrolet Blazer (2027-planning); Battery pack modules (2023-); 2.0-liter and 2.7-liter four cylinder engines, 5.3-liter and 6.2-liter V8 engines; Stamped ...
OEM Plants Updated at: 2025/06/12
General Motors, Fairfax Assembly & Stamping Plant[USA]
General Motors, Fairfax Assembly & Stamping Plant Chevrolet Malibu (2015-2024), Malibu HV (-2020); Buick LaCrosse(-2016); Cadillac XT4 (2018-2025 planning); EV Chevrolet Bolt (2026 planning-), Chevrolet Equinox (2027-planning); Affordable EV (planning) Passenger car assembly plant near Kansas City - Year opened: 1987 - Announced investment since 2014: USD 439 million - Employees as of Feb 2025: 2,229 GM restarts some production, keeps other plan...
OEM Plants Updated at: 2025/06/12
General Motors, Orion Assembly Plant[USA]
General Motors, Orion Assembly Plant Full-size ICE-powered SUVs and pickups (2027-planning); Chevrolet Sonic (Aveo successor, 2011-2020), Bolt EV (2016-2024), Bolt EUV (2021-2024), Cruise AV (self-driving vehicle) (2019-end of production); Buick Verano (2011-2016); Opel Ampera-e (2017-2019) GM's Orion plant in Michigan Year opened: 1983 Investment announced since 2014: over USD 4.8 billion Employees: 384 as of April 2025 Chevrolet supplies 855 ...
OEM Plants Updated at: 2025/06/12
Hino Motors, Hamura Plant[Japan]
Hino Motors, Hamura Plant Hino Light-duty trucks (HINO Dutro/HINO300 Series/HINO200 Series)/Toyota Dyna, Hino Light-duty trucks (HINO Dutro HV/HINO300 Series HV)/Toyota Dyna HV, Hino Light-duty BEV truck HINO Dutro Z EV (2022-), Toyota Land Cruiser "250" series (2024-), Land Cruiser "250" series HV (2024-), Toyota HMVs (High Mobility Vehicle), Toyota Toyoace (Integrated to Dyna in 2020), Toyota FJ Cruiser (-2022), Toyota Land Cruiser Prado ("150"...
OEM Plants Updated at: 2025/06/11
Al-Amal Company for Vehicles Manufacturing and Assembly[Egypt]
which halted local manufacturing. He further stated that the company is investing EGP 300 million in a new production line to locally assemble Chinese Forthing vehicles. On July 28, multiple sources reported that AvtoVAZ is planning to resume the assembly of Lada at its Al Amal plant in Egypt in 2024. Assembled Lada in Egypt will be delivered to Africa. AvtoVAZ has resumed the negotiation process and hopes that Al Amal can become the transport...
OEM Plants Updated at: 2025/06/11
Honda Automoveis do Brasil Ltda. (HAB), Sumare Plant[Brazil]
Honda Automoveis do Brasil Ltda. (HAB), Sumare Plant Honda Civic (1997-2021), Fit (2003-2021), City (2009-2021), HR-V (2015-2021), WR-V (2017-2021); Engine; Transmission (-2022) Honda Brazil's engine and components plant. Vehicle production was transferred to Honda Itirapina plant in 2021. - Investment: ・2024-2030: BRL 4.2 billion (USD 740 million) to launch new hybrid technologies and establish a local supply network ・2016: ...
OEM Plants Updated at: 2025/06/11
Nova Bus, Saint-Eustache Plant[Canada]
. On June 12, Volvo Buses’ North American subsidiary, Nova Bus, announced that it has received an order for 497 hybrid buses from the transit authorities in Quebec, Canada. The 5-year contract, coordinated by ATUQ (Association du Transport Urbain du Québec) and covering the period from 2020 to 2024, calls for the delivery of 497 40-foot LFS hybrid electric vehicle (HEV) buses built at the company’s Saint-Eustache plant. The order also enco...
OEM Plants Updated at: 2025/06/11
Ford Motor Canada, Oakville Assembly Plant[Canada]
Ford Motor Canada, Oakville Assembly Plant Ford SUV Edge/Endura (for Australia) (2006-2024), Flex (2008-2019); Lincoln SUV MKX (-2018), SUV Nautilus (2018-2023), MKT (2009-2019) Ford F-Series Super Duty (2026-planning), Ford Explorer EV (2027-planning), Lincoln Corsair E (2027-planning), Lincoln Aviator EV (2027-planning), Batteries (2027-planning) Crossover vehicle assembly plant - Investment announced since 2013: CAD 2.5 billion - Employees as...
OEM Plants Updated at: 2025/06/11
Hyundai Motor Brasil (HMB), Piracicaba Plant[Brazil]
Hyundai Motor Brasil (HMB), Piracicaba Plant HB20 (September 2012-),Creta Action (2016–);Creta Comfort (2016-) Kona Hybrid (planning) Engines (2022-): Kappa 1.0, Gamma 1.6 (2022 - 2024 ); Passenger car assembly, Hyundai owned - Investment: 2024 - 2032: BRL 5.5 billion (approx. USD 1.1 billion) 2022: BRL 550 million (approx. USD 88 million) 2021: BRL 350 million (approx. USD 63 million) 2011 - 2016: USD 830 million - Number of...
OEM Plants Updated at: 2025/06/11
General Motors do Brasil Ltda., General Motors Brazil[Brazil]
General Motors do Brasil Ltda., General Motors Brazil GM headquarters in Brazil General Motors do Brasil Ltda.'s Output : Vehicle 389,089 units (2023) Vehicle 412,366 units (2022) Vehicle 277,588 units (2021) Vehicle 351,917 units (2020) Vehicle 517,543 units (2019) Vehicle 466,445 units (2018) Vehicle 474,026 units (2017) - In January 2024, GM do Brasil announced an investment plan for the country of BRL 7 billion (USD 1.4 billion) that will be...
OEM Plants Updated at: 2025/06/11
General Motors Argentina, Rosario Plant[Argentina]
General Motors Argentina, Rosario Plant Chevrolet Tracker (2022-); Gasoline Engines: 1.4L, 1.8L; Chevrolet Agile (2009-2016), Corsa (-2013), Classic (-2016), Cruze (2016-2023); Passenger car and engine assembly plant, General Motors de Argentina S.A. - Investiment: 2017 - 2022: USD 500 million 1997: USD 2.0 billion - Number of employees: Approx. 1,200 (as of Apr., 2024) - Established in 1997 GM launches all-new Chevrolet Cruze in Brazil GM lau...
OEM Plants Updated at: 2025/06/11
SAIC Motor Passenger Vehicle Co., Ltd. Lingang Plant[China]
SAIC Motor Passenger Vehicle Co., Ltd. Lingang Plant MG: MG6, FHV MG3 Hybrid+ (2024-, for overseas markets); Roewe: RX5, SUV RX9 (2022-), EV D6 (2025-), SUV eRX5 PHV (2017-), PHV M7 DMH (2025-planning); Rising Auto: EV SUV R7 (2022-), EV F7 (2023-), EV SUV RC7 (2025-planning); IM Motors: EV L7 (2022-), EV LS7 (2022-), EV SUV LS6/MG IM6 (Some models are for export, 2023-), EV SUV L6/IM5 (Some models are for export, 2024-), REV SUV LS9 (2025-plan...
OEM Plants Updated at: 2025/06/11
Chery Commercial Vehicle (Anhui) Co., Ltd. Henan Branch (formerly Chery Automobile Henan Co., Ltd.)[China]
Chery Commercial Vehicle (Anhui) Co., Ltd. Henan Branch (formerly Chery Automobile Henan Co., Ltd.) Karry: Mini-Truck Youyue /X6 (2021-), EV Dolphin (2019-), EV Finless Porpoise (2022-), EV Xiaoxiang (2022-), EV Finless Porpoise E5 (2024-), EV Xiaoxiang X3 (2024-); Jetour: SUV X70 (2018-), SUV X70S (2018-), SUV X70M (2020-), SUV X70 PLUS (2020-), SUV X70 PRO (2023-), SUV X90 (2018-), SUV X90 PLUS (2021-), SUV X95 (2019-), Dashing (X-1, 2022-), Da...
OEM Plants Updated at: 2025/06/11
General Motors Company[USA]
General Motors Company GM Group's headquarters, to move to Hudson’s Detroit in 2025 General Motors Company Production Capacity in the U.S. Plants units/year Production Capacity Note General Motors, Factory ZERO (Detroit-Hamtramck Plant) 75,000 to 100,000 EVs a year to be produced in 2024 or 2025 General Motors, Flint Assembly Plant 266,000 General Motors, Lansing Delta Township Plant 290,000 General Motors, Lansin...
OEM Plants Updated at: 2025/06/11
General Motors Brazil, Sao Jose dos Campos Plant[Brazil]
General Motors Brazil, Sao Jose dos Campos Plant Chevrolet: S10, TrailBlazer, Engines: 1.0L, 1.4L engines for Joy, Duramax 2.8-liter I4 XLD28 turbodiesel engines; Transmissions, CKD kits for export Passenger car and truck assembly plant - Investment: 2024 - 2028: BRL 5.5 billion (approx. USD 1 billion) for operational facilities in Sao Paulo State 2020 - 2024: BRL 10 billion (approx. USD 2 billion) for Sao Caetano do Sul and Sao Jose d...
OEM Plants Updated at: 2025/06/11
General Motors Brazil, Gravatai Plant[Brazil]
General Motors Brazil, Gravatai Plant Chevrolet Celta (2000-2015), Prisma (2006-2019), Onix (2012-2019), Onix hatch (2019-), Onix Plus sedan (2019-) Passenger car assembly plant - Number of employees: approx. 5,000 (as of Feb, 2025) - Investment: 2024-2028: BRL 1.2 billion (USD 220 million), for the the expansion of Chevrolet's compact line and launching of a new vehicle in 2026 2017-2019: BRL 1.4 billion (USD 270 million) - Establishe...
OEM Plants Updated at: 2025/06/11
LG Energy Solution Michigan, Inc.[USA]
December and January as the company is moving and retooling some production lines from its current production facility to the second factory at the Holland site. The layoffs come amid a USD 1.7 billion expansion at the company’s Holland plant where construction is expected to be complete by April 2024 and be fully operational by 2025. LG announced in October a USD 3 billion investment for tooling and equipment exclusively for battery supply to ...
OEM Plants Updated at: 2025/06/11
BMW Manufacturing Co., Spartanburg Plant[USA]
illion battery plant in South Carolina BMW launches production of new XM model at Spartanburg BMW investing EUR 800 million to assemble EVs, batteries in Mexico BMW Individual paint finishes available in Spartanburg for new BMW XM BMW to source aluminum from sustainable production in Canada from 2024 BMW Manufacturing largest automotive U.S. exporter for ninth consecutive year BMW’s Spartanburg plant extends sustainable landfill gas energy...
OEM Plants Updated at: 2025/06/11
LG Energy Solution, Lansing Plant[USA]
LG Energy Solution, Lansing Plant EV battery cells, ESS battery cells GM sold its stake of the JV project to LG Energy Solutions in first half of 2025, with production waiting to start - GM announced in December 2024 it is selling its stake in this single plant to JV partner LG Energy Solutions - location adjacent to GM Lansing Delta Twp. plant - 2.8-million-square-foot plant GM’s Ultium Cells receives incentives from Indiana for fourth bat...
OEM Plants Updated at: 2025/06/11
Toyota Motor Kyushu, Miyata Plant[Japan]
talled, increasing the output from 135kW to 146kW. In addition, the output of the rear motor in the AWD model has been increased to 30kW. The UX300e model offers improved convenience by reducing the quick charging time by approximately 25%. The UX300h is scheduled to go on sale around early January 2024, and the UX300e around late January. On January 7, Toyota Motor Corporation (Toyota) announced its plant operation schedule for the new year in J...
OEM Plants Updated at: 2025/06/10