Search Results by Category
All information related to {{ key_word }}.
AI Navigator will guide you. Click here for information about {{ key_word }}.
1 - 20 of 272 results
Stellantis Ukraine announces 2026 product lineup at annual press conference
with 6-speed AISIN automatic transmission. DS Automobiles will introduce a new diesel version of the DS N°4 crossover coupe in April 2026, powered by a 1.5 BlueHDi engine (of 130 hp) paired with 8-speed automatic transmission. The new Jeep Compass will launch in Ukraine in April 2026. Built on the STLA Medium platform, it offers features such as the Selec-Terrain system and all-wheel drive. In summer 2026, Jeep will introduce the updated Jeep Av...
News Updated at: 2026/03/31
Stellantis, Opel Espana de Automoviles, S.A., Zaragoza (Figueruelas) Plant[Spain]
Stellantis, Opel Espana de Automoviles, S.A., Zaragoza (Figueruelas) Plant Line 1: Citroen C3 Aircross (2017-2024), Opel Crossland (2017-2024); Line 2: Opel/Vauxhall Corsa 5-door, Corsa 3-door (1982-2019), Corsa F (2019-), EV Corsa-e (2020-), Corsa MHV (2023-); Lancia Ypsilon (2023-), Ypsilon EV (e-CMP) (2024-), Ypsilon MHV (2024-2026 planning), EV Delta (STLA Medium)(2028-planning); Peugeot EV e-208 (2023-); Meriva (2003-2017), Combo (2007-2011...
OEM Plants Updated at: 2026/03/31
Stellantis Europe S.p.A., Mirafiori (Turin) Plant[Italy]
million vehicles in Italy, 40% more than the current production level. The hybrid Fiat 500, to be produced at Mirafiori, will launch in early 2026, adding to the current production of full-electric Fiat 500s and new Maserati GT and GC models. By 2026, Melfi plant will produce five models on the new STLA medium platform, starting with a new car in early 2025, followed by Jeep, DS, Lancia, and the new hybrid version of Jeep Compass. Stellantis also...
OEM Plants Updated at: 2026/03/26
Stellantis, FCA Italy, Melfi (Basilicata) Plant[Italy]
Stellantis, FCA Italy, Melfi (Basilicata) Plant Fiat Grande Punto (-2018), Punto Evo (Grande Punto successor, 2009-2018), 500X (2014-2025), 500X MHV (2022-2025); Jeep Renegade (2014-2022), Jeep Compass (2020-2022), PHV Jeep Renegade 4xe (2020-2025), PHV Jeep Compass 4xe (2020-2024, 2025-), Jeep Compass EV (2025-), Jeep Compass MHV (STLA medium) (2025-), Jeep Renegade MHV (2022-2025); DS: EV DS N°8 (STLA Medium) (2025-), DS N°7 MHV (STLA Medium)...
OEM Plants Updated at: 2026/03/24
Europe/Stellantis/DS/DS Nº7 E-Tense
DS Nº7 E-Tense STLA Medium PF An EV version of the "DS Nº7". The EV powertrain comes in three power output options: 230hp (FWD), 245hp (FWD Long Range), and 350hp (AWD Long Range). The maximum driving range is 740km. It is produced at the Melfi plant in Italy....
Model Launch Schedules Updated at: 2026/03/23
Europe/Stellantis/DS/DS 7
DS 7 EMP2 PF STLA Medium PF A C-segment SUV. Produced at the Mulhouse plant in France. Equipped with a 1.5L 4-cylinder turbo diesel engine. The PHV "DS 7 E-Tense" is equipped with a 1.6L 4-cylinder turbo gasoline engine. The next-generation model will be renamed "DS Nº7". A MHV with a 1.2L 3-cylinder turbo gasoline engine will be offered and produced at the Melfi plant in Italy....
Model Launch Schedules Updated at: 2026/03/23
Stellantis unveils DS N°7 SUV with electric and hybrid powertrains
s up to 740 km. It is made in Billy Berclau's ACC Gigafactory in France, while the motors come from eastern France. The AWD Long Range version offers up to 679 km. The standard FWD version with a 73.7 kWh battery delivers up to 543 km. The car is assembled in Stellantis Melfi site, Italy, based on STLA Medium platform. Fast charging allows the battery to go from 20% to 80% in about 27 minutes (31 minutes for the smaller battery). It can also add...
News Updated at: 2026/03/18
Stellantis, Fiat Powertrain Technologies, Termoli Plant / Automotive Cell Company (ACC), Termoli Plant[Italy]
nment officials, Stellantis representatives, regional authorities, ANFIA, and trade unions. Stellantis confirmed that all Italian plants will remain active, with planned investments of EUR 2 billion in plants by 2025. In the Pomigliano plant, from 2028, it will produce two new compact models on the STLA-SMALL platform. Panda production extended until 2030, followed by its next generation of the same model. In the Mirafiori plant, the Commercial V...
OEM Plants Updated at: 2026/03/13
USA/Stellantis/Dodge/Charger
Charger LX PF STLA Large PF Dodge’s flagship full-size sedan. Available as a two-door coupe and a four-door sedan. It is produced at the Windsor plant in Canada and is equipped with a new 3.0L six-cylinder SIXPACK twin-turbo engine....
Model Launch Schedules Updated at: 2026/03/12
Stellantis, FCA Canada, Windsor Assembly Plant[Canada]
tober to accommodate minivan fleet order FCA idling Windsor minivan plant for 5 weeks for upgrades FCA extends third shift at Windsor Assembly minivan assembly plant in Canada Stellantis rescinds decision to cut second shift at Windsor Assembly Plant Stellantis announces allocation of BEV-centric STLA large vehicles to Cassino plant Stellantis eliminates steam in the paint shop at Wiindsor assmbly plant in Canada Stellantis’ Windsor Assembly...
OEM Plants Updated at: 2026/03/11
Stellantis, FCA US, Warren Truck Assembly Plant[USA]
plans to invest: Belvidere Assembly Plant- USD 1.5 billion for new midsize pickup truck (2027) 80-100,000 units annually; Detroit Assembly Complex- USD 1.5 billion, including next Durango ICE, BEV (2026) Grand Cherokee (2027), Toledo Assembly Complex North and South- USD 1.5 billion, including Jeep STLA frame, BEV (2028); Sterling Heights Assembly Plant- USD 1.4 billion for new Ram 1500, BEV, STLA frame (2024); Warren Truck Assembly Plant- USD 60...
OEM Plants Updated at: 2026/03/04
Stellantis, FCA US, Toledo Assembly Complex (Toledo Supplier Park)[USA]
plans to invest: Belvidere Assembly Plant- USD 1.5 billion for new midsize pickup truck (2027) 80-100,000 units annually; Detroit Assembly Complex- USD 1.5 billion, including next Durango ICE, BEV (2026) Grand Cherokee (2027), Toledo Assembly Complex North and South- USD 1.5 billion, including Jeep STLA frame, BEV (2028); Sterling Heights Assembly Plant- USD 1.4 billion for new Ram 1500, BEV, STLA frame (2024); Warren Truck Assembly Plant- USD 60...
OEM Plants Updated at: 2026/03/04
Stellantis, FCA US, Toledo Assembly Complex (Toledo North)[USA]
plans to invest: Belvidere Assembly Plant- USD 1.5 billion for new midsize pickup truck (2027) 80-100,000 units annually; Detroit Assembly Complex- USD 1.5 billion, including next Durango ICE, BEV (2026) Grand Cherokee (2027), Toledo Assembly Complex North and South- USD 1.5 billion, including Jeep STLA frame, BEV (2028); Sterling Heights Assembly Plant- USD 1.4 billion for new Ram 1500, BEV, STLA frame (2024); Warren Truck Assembly Plant- USD 60...
OEM Plants Updated at: 2026/03/04
Stellantis, FCA US, Sterling Heights Assembly Plant[USA]
our Jeep EVs that will be launched globally before the end of 2025. Electrified models will be built on the same line as ICE versions of the Jeep Wagoneer/ Wagoneer L/ Grand Wagoneer / Grand Wagoneer L. Dundee Engine Plant will receive USD 73 million to assemble, weld and test battery trays for the STLA Frame architecture and machine the front and rear beams for the STLA Large architecture, with production to begin in 2024 and 2026, respectively,...
OEM Plants Updated at: 2026/03/04
Stellantis, FCA US, Detroit Assembly Complex - Jefferson (formerly Jefferson North Assembly Plant)[USA]
plans to invest: Belvidere Assembly Plant- USD 1.5 billion for new midsize pickup truck (2027) 80-100,000 units annually; Detroit Assembly Complex- USD 1.5 billion, including next Durango ICE, BEV (2026) Grand Cherokee (2027), Toledo Assembly Complex North and South- USD 1.5 billion, including Jeep STLA frame, BEV (2028); Sterling Heights Assembly Plant- USD 1.4 billion for new Ram 1500, BEV, STLA frame (2024); Warren Truck Assembly Plant- USD 60...
OEM Plants Updated at: 2026/03/04
Stellantis 2025 financial results and Q&A: Path to profitable growth: product expansion, efficiency gains and regional turnarounds
hief Financial Officer. Main Q&As Q1. Can you talk about Europe and whether we need larger restructuring measures? Also, is the U.S. business starting to turn the corner and bring profits? A. [Antonio Filosa, CEO] Europe is showing higher market share and volumes in January–February. Demand for STLA AutoDrive products is strong and orders are up 80% YoY. Light Commercial Vehicles (LCVs) remain a key profit driver with around 30% market share....
News Updated at: 2026/03/03
Europe/Stellantis/Opel/Corsa Electric
Corsa Electric eCMP PF STLA Small PF B-segment 5-door hatchback EV with a maximum cruising range (WLTP mode) of 428 km. It is produced at the Zaragoza Plant in Spain....
Model Launch Schedules Updated at: 2026/03/02
Stellantis, FCA Italy, Giambattista Vico (Pomigliano d'Arco) Plant[Italy]
Stellantis, FCA Italy, Giambattista Vico (Pomigliano d'Arco) Plant Fiat Panda/Pandina (2011-2020), Fiat Panda/Pandina MHV (2020-2030 planning); Alfa Romeo: SUV Tonale MHV (2022-), SUV Tonale PHV (2022-); Dodge: SUV Hornet (2022-2025), SUV Hornet R/T PHV (2023-2025); Two new compact models based on the STLA Small platform (2028 planning-); Stellantis (FCA), Passenger car assembly plant - Number of Employees: 3,800 (as of Sep, 2025) - Production ...
OEM Plants Updated at: 2026/02/20
Stellantis, FCA US, Belvidere Assembly Plant and Belvidere Satellite Stamping Plant[USA]
tis initially planned for Belvidere, a USD 3 billion joint-venture battery plant, which was expected to be built across the street from the assembly plant, and a USD 100 million Mopar parts mega hub, appear to no longer be moving ahead. The new midsize Ram is expected to be based on the automaker's STLA Large platform, which would give it the ability to be configured in gas, hybrid and fully electric options. On October 14, Stellantis announced...
OEM Plants Updated at: 2026/02/19
StarPlus Energy, Kokomo plant[USA]
plans to invest: Belvidere Assembly Plant- USD 1.5 billion for new midsize pickup truck (2027) 80-100,000 units annually; Detroit Assembly Complex- USD 1.5 billion, including next Durango ICE, BEV (2026) Grand Cherokee (2027), Toledo Assembly Complex North and South- USD 1.5 billion, including Jeep STLA frame, BEV (2028); Sterling Heights Assembly Plant- USD 1.4 billion for new Ram 1500, BEV, STLA frame (2024); Warren Truck Assembly Plant- USD 60...
OEM Plants Updated at: 2026/02/13



Japan
USA
Mexico
Germany
China (Shanghai)
Thailand
India