Search Results by Category

All information related to {{ key_word }}.
AI Navigation will guide you. Click here for information about {{ key_word }}.










1 - 20 of 49 results
HPE Automotores do Brasil Ltda., Catalao Plant[Brazil]
and 47.9 kgf.m of torque. HPE assured that factory workers would not be laid off but reassigned to other operations, a measure confirmed by the local metalworkers' union. Suzuki has provided new trim items for the 2020 Jimny produced in Catalão, Brazil as it prepares to launch the new-gen Jimny Sierra, which was introduced at the São Paulo Motor Show in 2018 ahead of a then-promised launch in the second half of 2019. Model changes for 2020 J...
OEM Plants Updated at: 2025/06/21
GM Brownstown Battery and GM/Honda Fuel Cell System Manufacturing, LLC (FCSM)[USA]
at Spring Hill plant, which will continue to build the traditional Cadillac XT6 and XT5, though production of the next-generation GMC Acadia will move to Lansing Delta Township Assembly. GM is investing USD 32 million at Flint Assembly for future production of heavy-duty Chevrolet Silverado and GMC Sierra pickups, and USD 17 million in the Romulus, Michigan propulsion plant to increase capacity of GM’s 10-speed truck transmission. GM is investi...
OEM Plants Updated at: 2025/06/21
Ford Motor Spain, Valencia (Almussafes) Plant[Spain]
– will continue in production, with full hybrid versions of both recently launched. Launched in 1993, the Mondeo was the first Ford vehicle to be hailed as a “global” car, intended to consolidate a number of Ford models around the world. Since its launch in Europe where it replaced the Ford Sierra, Mondeo sales have reached around five million to date. On March 25, Ford announced it is continuing to invest in an electrified future for its...
OEM Plants Updated at: 2025/06/20
General Motors, Fairfax Assembly & Stamping Plant[USA]
some U.S. plants for a combined total of 10 weeks of production time in the second half of 2017. Local union officials have suggested that affected plants will include the Fairfax Assembly Plant where the Chevrolet Malibu is built; the Fort Wayne Assembly Plant where the Chevrolet Silverado and GMC Sierra are built; and the Lordstown Assembly Plant where the Chevrolet Cruze is built. More downtime is possible at GM’s Lansing Delta Township Asse...
OEM Plants Updated at: 2025/06/20
General Motors, Wentzville Assembly Plant[USA]
ille plant operates on three shifts of production and currently employs about 4,000 hourly and 330 salaried employees. On January 13, General Motors revealed the new 2021 GMC Canyon line, including a first-ever Canyon AT4 aimed at premium midsize truck for off-road use, similar to the full-size GMC Sierra AT4. The new 2021 GMC Canyon, available later in 2020, is built at GM’s Wentzville Assembly Center in Wentzville, Missouri. The GMC Canyon De...
OEM Plants Updated at: 2025/06/20
General Motors, Bowling Green Plant[USA]
some U.S. plants for a combined total of 10 weeks of production time in the second half of 2017. Local union officials have suggested that affected plants will include the Fairfax Assembly Plant where the Chevrolet Malibu is built; the Fort Wayne Assembly Plant where the Chevrolet Silverado and GMC Sierra are built; and the Lordstown Assembly Plant where the Chevrolet Cruze is built. More downtime is possible at GM’s Lansing Delta Township Asse...
OEM Plants Updated at: 2025/06/18
General Motors, Factory ZERO (Detroit-Hamtramck Plant) [USA]
General Motors, Factory ZERO (Detroit-Hamtramck Plant) EV GMC Hummer (2021-), EV Hummer SUV (2023-), EV Cruise Origin shuttle (2023-, halted through 2024), Chevrolet Silverado EV (2024-), GMC Sierra EV (2024-), Cadillac Escalade IQ (2024-), Cadillac Escalade IQL (2025-); EV battery pack modules (2023-); Chevrolet PHV Volt (2010-2019) / Opel PHV Ampera (2011-2014); Chevrolet Malibu (2012-2016), Impala (2013-2020); Cadillac ELR (2013-2016), CT6 ...
OEM Plants Updated at: 2025/06/13
General Motors, Orion Assembly Plant[USA]
ing GM Subsystems avoids strike, reaches tentative agreement with UAW Chevrolet Bolt EV to remain in lineup for “some time” as Ultium EVs ramp up GM Subsystems LLC subsidiary workers ratify contract with pay increase GM reports 24% jump in U.S. sales for Q3 2022 GMC introduces all-new 2024 Sierra EV, begins taking orders GM reports record revenue in Q3 2022, profits up 36.6% to USD 3.3 billion GM Lake Orion plant expansion underway GM ...
OEM Plants Updated at: 2025/06/12
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly)[USA]
engine plant within the Spring Hill Manufacturing complex for upgrades to increase production capacity for 5.3-liter V8 engines. The 5.3-liter V8 engine, with Dynamic Fuel Management, is paired with a 10-speed automatic transmission in Chevrolet’s Silverado, Tahoe and Suburban, as well as the GMC Sierra. This latest announced investment adds to the previously announced USD 22 million investment in the engine plant made in early 2019, and contri...
OEM Plants Updated at: 2025/06/12
LG Energy Solution, Lansing Plant[USA]
oyees capable of building 41 GWh of EV batteries per year. The Ultium Cells Lansing plant will be in close proximity to supply the GM Lansing Grand River, Lansing Delta Township and GM Factory Zero plants with EV batteries to produce models including the GMC Hummer EV Pickup, GMC Hummer EV SUV, GMC Sierra EV, and Chevrolet Silverado EV. GM’s Q4 2023 earnings report revealed that full production has been achieved at the Ultium Cells plant in War...
OEM Plants Updated at: 2025/06/11
General Motors, Toledo Propulsion Systems (formerly Toledo Transmission Plant)[USA]
repare the facility for future engine casting components work. On February 4, General Motors announced it will invest USD 75 million in its Toledo Transmission Plant in Ohio to increase the plant’s capacity to build 10-speed automatic transmissions that are used in the Chevrolet Silverado and GMC Sierra. The plant’s 1,700 employees currently build GM’s six-speed, eight-speed, and 10-speed rear-wheel-drive and nine-speed front-wheel-drive tr...
OEM Plants Updated at: 2025/06/10
General Motors, Lansing Grand River Assembly / Stamping Plant[USA]
nd Chevrolet Equinox downtime through the week of October 11. On October 25, GM confirmed it will have Saturday overtime shifts at six North American plants in November as it works itself through the global semiconductor shortage, including Fort Wayne and Silao Assembly (Chevrolet Silverado and GMC Sierra trucks), Wentzville Assembly, (GMC Canyon and Chevrolet Colorado), Lansing Grand River Assembly (Cadillac CT4 and CT5, and Chevrolet Camaro), L...
OEM Plants Updated at: 2025/06/05
General Motors, Flint Assembly Plant[USA]
General Motors, Flint Assembly Plant Chevrolet Silverado 2500/3500HD, Silverado HD ZR2 (2023-), Silverado HD ZR2 Bison (2023-); GMC Sierra 2500/3500HD; Chevrolet Silverado 4500/5500/6500HD (2018-) GM's Flint truck assembly plant in Michigan Year opened: 1947 Announced investment since 2014: over USD 1.9 billion Employees as of October 2024: 4,524 GM idles production at Flint Assembly, Arlington Assembly due to Hurricane Helene GM resumes producti...
OEM Plants Updated at: 2025/06/05
General Motors Mexico, Ramos Arizpe Plant[Mexico]
c crossover that Honda produces in Ramos Arizpe thanks to its alliance with GM. On October 18, General Motors recalled 700 workers to restart Chevrolet Impala production at its assembly plant in Oshawa, Ontario, while 1,300 wait to begin production of previous-generation Chevrolet Silverado and GMC Sierra pickups, after the United Auto Workers (UAW) union reached a tentative deal in the U.S. Employees at other affected non-UAW GM plants still hav...
OEM Plants Updated at: 2025/05/26
Nissan Mexico, Aguascalientes Plant 1[Mexico]
ved from producing cars such as the Aveo and Sonic, toward SUVs such as the GMC Terrain and Chevrolet Equinox. The Ramos Arizpe plant recently started production of the Chevrolet Blazer, and will soon stop manufacturing the Chevrolet Cruze. GM’s plant in Silao produces Chevrolet Silverado and GMC Sierra pickups. Of Nissan’s three brand assembly plants in Mexico, only one produces pickups, which are sold only in Mexico and South America. The I...
OEM Plants Updated at: 2025/05/19
General Motors Canada, St. Catharines Plant[Canada]
o to 2027 On September 18, General Motors temporarily laid off approximately 1,200 employees at the company's assembly plant in Oshawa, Ontario, because of a strike in the U.S., with more job cuts expected soon. Employees on the Oshawa truck line perform final assembly on outgoing models of the GMC Sierra and Chevrolet Silverado, which are shipped to the plant from Ft. Wayne, Indiana. Unifor union president Jerry Dias says he expects the second l...
OEM Plants Updated at: 2025/05/13
General Motors Canada, Oshawa Car Assembly Plant[Canada]
General Motors Canada, Oshawa Car Assembly Plant Chevrolet Silverado HD (2021-), Chevrolet Silverado 1500 (2022-); Buick Regal, Regal HV (2011-2017), Cadillac XTS (2012-2019), Chevrolet Silverado (2018-2019); GMC Sierra (2018-2019); Chevrolet Impala (2000-2019), Camaro (2009-2015), Equinox (2010-2016); Passenger car and pickup truck assembly plant, production restarted at the end of 2021 -Production restarted in November 2021 -Employees as of J...
OEM Plants Updated at: 2025/05/13
Ultium Cells LLC, Spring Hill Plant [USA]
onference, GM CFO Paul Jacobson said that the Ultium Cells Warren plant in Ohio plant is currently running at 80% capacity, while the Ultium Cells Spring Hill plant in Tennessee is running at 40%, providing batteries for the Cadillac Lyriq, Chevy Blazer EV, Chevy Equinox EV, Chevy Silverado EV, GMC Sierra EV, and GMC Hummer EV. The figures help explain GM’s decision to sell its stake in the Ultium Cells plant currently under construction in Lan...
OEM Plants Updated at: 2025/05/12
General Motors, Arlington Assembly Plant[USA]
to the strong profit margins of the popular SUVs it produces. On October 25, GM confirmed it will have Saturday overtime shifts at six North American plants in November as it works itself through the global semiconductor shortage, including Fort Wayne and Silao Assembly (Chevrolet Silverado and GMC Sierra trucks), Wentzville Assembly, (GMC Canyon and Chevrolet Colorado), Lansing Grand River Assembly (Cadillac CT4 and CT5, and Chevrolet Camaro), L...
OEM Plants Updated at: 2025/05/09
Ultium Cells LLC, Warren Plant [USA]
onference, GM CFO Paul Jacobson said that the Ultium Cells Warren plant in Ohio plant is currently running at 80% capacity, while the Ultium Cells Spring Hill plant in Tennessee is running at 40%, providing batteries for the Cadillac Lyriq, Chevy Blazer EV, Chevy Equinox EV, Chevy Silverado EV, GMC Sierra EV, and GMC Hummer EV. The figures help explain GM’s decision to sell its stake in the Ultium Cells plant currently under construction in Lan...
OEM Plants Updated at: 2025/04/28