Search Results by Category

All information related to {{ key_word }}.
AI Navigation will guide you. Click here for information about {{ key_word }}.









1 - 4 of 4 results
Ultium Cells LLC, Spring Hill Plant [USA]
EV every minute. Using AI-powered cameras and robotics only 250 workers at the Ultium Cells facility in Tennessee, overseeing a highly automated system spanning chemical mixing, coating, curing, and cell stacking. Finished cells are shipped to vehicle assembly lines to power the Cadillac Lyriq and Vistiq, Chevrolet Blazer EV and Equinox EV, Honda Prologue and Acura ZDX. Ultium Cells Warren, Ohio began production in August 2022 and currently empl...
OEM Plants Updated at: 2025/07/15
Ultium Cells LLC, Warren Plant [USA]
EV every minute. Using AI-powered cameras and robotics only 250 workers at the Ultium Cells facility in Tennessee, overseeing a highly automated system spanning chemical mixing, coating, curing, and cell stacking. Finished cells are shipped to vehicle assembly lines to power the Cadillac Lyriq and Vistiq, Chevrolet Blazer EV and Equinox EV, Honda Prologue and Acura ZDX. Ultium Cells Warren, Ohio began production in August 2022 and currently empl...
OEM Plants Updated at: 2025/07/07
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly)[USA]
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly) Chevrolet Equinox (2012-2015); Cadillac XT5, XT5 HV (2016-), XT6 (2019-end of 2025 planning), EV Lyriq (2022-), EV Vistiq (2025-); GMC Acadia (2016-2024), Holden Acadia (2018-2019); EV Acura ZDX (2024-), ZDX Type S (2024-); Chevrolet Blazer (2027-planning); Battery pack modules (2023-); 2.0-liter and 2.7-liter four cylinder engines, 5.3-liter and 6.2-liter V8 engines; Stam...
OEM Plants Updated at: 2025/06/25
General Motors, Fairfax Assembly & Stamping Plant[USA]
er. GM spokesperson Kevin Kelly said the plant will reopen in 2026 with one shift until May 2026, when the second shift is expected to be added back. The company will additionally shutter this year for the weeks of October 10 and November 24. The plant produces the midsize Cadillac Lyriq and larger Vistiq electric crossovers. GM is also planning to delay the start of a second shift at its Fairfax Assembly Plant when it begins production of the re...
OEM Plants Updated at: 2025/06/20