Search Results by Category

All information related to {{ key_word }}.
AI Navigation will guide you. Click here for information about {{ key_word }}.










1 - 20 of 49 results
Nissan Mexico, Aguascalientes Plant 2 (3rd plant in Mexico)[Mexico]
ved from producing cars such as the Aveo and Sonic, toward SUVs such as the GMC Terrain and Chevrolet Equinox. The Ramos Arizpe plant recently started production of the Chevrolet Blazer, and will soon stop manufacturing the Chevrolet Cruze. GM’s plant in Silao produces Chevrolet Silverado and GMC Sierra pickups. Of Nissan’s three brand assembly plants in Mexico, only one produces pickups, which are sold only in Mexico and South America. The I...
OEM Plants Updated at: 2025/07/17
General Motors, Orion Assembly Plant[USA]
General Motors, Orion Assembly Plant Cadillac Escalade (2027-planning), Chevrolet Silverado (2027-planning), GMC Sierra (2027-planning); EV battery module production (2024-), Chevrolet Sonic (Aveo successor, 2011-2020), Bolt EV (2016-2024), Bolt EUV (2021-2024), Cruise AV (self-driving vehicle) (2019-end of production); Buick Verano (2011-2016); Opel Ampera-e (2017-2019) GM's Orion plant in Michigan Year opened: 1983 Investment announced since ...
OEM Plants Updated at: 2025/07/16
Ultium Cells LLC, Spring Hill Plant [USA]
onference, GM CFO Paul Jacobson said that the Ultium Cells Warren plant in Ohio plant is currently running at 80% capacity, while the Ultium Cells Spring Hill plant in Tennessee is running at 40%, providing batteries for the Cadillac Lyriq, Chevy Blazer EV, Chevy Equinox EV, Chevy Silverado EV, GMC Sierra EV, and GMC Hummer EV. The figures help explain GM’s decision to sell its stake in the Ultium Cells plant currently under construction in Lan...
OEM Plants Updated at: 2025/07/15
DMAX, Ltd., Brookville plant[USA]
DMAX, Ltd., Brookville plant Duramax 6.6-liter V8 turbo-diesel engines for Chevrolet Silverado HD, GMC Sierra HD pickups Second DMAX plant in Ohio - Investment for expansion announced June 2023: USD 920 million - Original investment: USD 175 million - Approximately 1.1 million square feet is to be added to the existing 250,000 - Constructed on a 75-acre site purchased in 2019 and opened in 2021 - Employees by February 2025: 100 GM to invest USD...
OEM Plants Updated at: 2025/07/07
Ultium Cells LLC, Warren Plant [USA]
onference, GM CFO Paul Jacobson said that the Ultium Cells Warren plant in Ohio plant is currently running at 80% capacity, while the Ultium Cells Spring Hill plant in Tennessee is running at 40%, providing batteries for the Cadillac Lyriq, Chevy Blazer EV, Chevy Equinox EV, Chevy Silverado EV, GMC Sierra EV, and GMC Hummer EV. The figures help explain GM’s decision to sell its stake in the Ultium Cells plant currently under construction in Lan...
OEM Plants Updated at: 2025/07/07
GM Components, Rochester Operations[USA]
turing coolant lines for EV battery packs as a result of production changes at the GM CAMI plant in Canada, which produces the Chevrolet BrightDrop delivery vans and will be idled for at least 5 months this year, and at Factory ZERO, which produces the GMC Hummer EV, Chevrolet Silverado EV, and GMC Sierra EV. The Rochester plant still dedicates roughly 60 % of its output to parts for ICE-powered vehicles. UAW Local 1097 President Dan Maloney stat...
OEM Plants Updated at: 2025/07/03
DMAX, Ltd., Moraine Plant[USA]
ore than 3,000 workers in Canada and DMAX diesel engine plant in Moraine, Ohio. On October 18, General Motors recalled 700 workers to restart Chevrolet Impala production at its assembly plant in Oshawa, Ontario, while 1,300 wait to begin production of previous-generation Chevrolet Silverado and GMC Sierra pickups, after the United Auto Workers (UAW) union reached a tentative deal in the U.S. Employees at other affected non-UAW GM plants still hav...
OEM Plants Updated at: 2025/07/03
General Motors, Spring Hill Manufacturing (formerly Spring Hill Assembly)[USA]
engine plant within the Spring Hill Manufacturing complex for upgrades to increase production capacity for 5.3-liter V8 engines. The 5.3-liter V8 engine, with Dynamic Fuel Management, is paired with a 10-speed automatic transmission in Chevrolet’s Silverado, Tahoe and Suburban, as well as the GMC Sierra. This latest announced investment adds to the previously announced USD 22 million investment in the engine plant made in early 2019, and contri...
OEM Plants Updated at: 2025/06/25
Punch Powertrain PSA e-Transmissions NV[Belgium]
antis secures full control over Punch Powertrain joint venture Stellantis expands eDCT transmission production with new Termoli plant, Italy in 2026 On October 22, Punch Powertrain announced that DT2 transmission (also known as eDCT) was rigorously tested in real-life extreme summer conditions in Sierra Nevada, Spain. The extensive tests that covered over 10,000 km, with a focus on performance in high temperatures and heavy loads, delivered par...
OEM Plants Updated at: 2025/06/23
HPE Automotores do Brasil Ltda., Catalao Plant[Brazil]
xtension of a recent tax benefit would make Caoa's investment in the Anápolis plant feasible, as well as another BRL 500 million in the HPE / Mitsubishi plant in Catalão. Suzuki has provided new trim items for the 2020 Jimny produced in Catalão, Brazil as it prepares to launch the new-gen Jimny Sierra, which was introduced at the São Paulo Motor Show in 2018 ahead of a then-promised launch in the second half of 2019. Model changes for 2020 J...
OEM Plants Updated at: 2025/06/21
GM Brownstown Battery and GM/Honda Fuel Cell System Manufacturing, LLC (FCSM)[USA]
at Spring Hill plant, which will continue to build the traditional Cadillac XT6 and XT5, though production of the next-generation GMC Acadia will move to Lansing Delta Township Assembly. GM is investing USD 32 million at Flint Assembly for future production of heavy-duty Chevrolet Silverado and GMC Sierra pickups, and USD 17 million in the Romulus, Michigan propulsion plant to increase capacity of GM’s 10-speed truck transmission. GM is investi...
OEM Plants Updated at: 2025/06/21
Ford Motor Spain, Valencia (Almussafes) Plant[Spain]
– will continue in production, with full hybrid versions of both recently launched. Launched in 1993, the Mondeo was the first Ford vehicle to be hailed as a “global” car, intended to consolidate a number of Ford models around the world. Since its launch in Europe where it replaced the Ford Sierra, Mondeo sales have reached around five million to date. On March 25, Ford announced it is continuing to invest in an electrified future for its...
OEM Plants Updated at: 2025/06/20
General Motors, Fairfax Assembly & Stamping Plant[USA]
facturing plants to increase U.S. production of both ICE and electric vehicles. Orion Assembly will begin production of ICE-powered full-size SUVs and light duty pickup trucks in early 2027. As a result, GM’s Factory ZERO will be the dedicated assembly location for the Chevrolet Silverado EV, GMC Sierra EV, Cadillac ESCALADE IQ, and GMC HUMMER EV pickup and SUV. Orion was originally slated to produce EV trucks after retooling. Fairfax Assembly ...
OEM Plants Updated at: 2025/06/20
General Motors, Wentzville Assembly Plant[USA]
mber 20, though Chevrolet Malibu production will remain down. On October 25, GM confirmed it will have Saturday overtime shifts at six North American plants in November as it works itself through the global semiconductor shortage, including Fort Wayne and Silao Assembly (Chevrolet Silverado and GMC Sierra trucks), Wentzville Assembly, (GMC Canyon and Chevrolet Colorado), Lansing Grand River Assembly (Cadillac CT4 and CT5, and Chevrolet Camaro), L...
OEM Plants Updated at: 2025/06/20
General Motors, Bowling Green Plant[USA]
some U.S. plants for a combined total of 10 weeks of production time in the second half of 2017. Local union officials have suggested that affected plants will include the Fairfax Assembly Plant where the Chevrolet Malibu is built; the Fort Wayne Assembly Plant where the Chevrolet Silverado and GMC Sierra are built; and the Lordstown Assembly Plant where the Chevrolet Cruze is built. More downtime is possible at GM’s Lansing Delta Township Asse...
OEM Plants Updated at: 2025/06/18
General Motors, Factory ZERO (Detroit-Hamtramck Plant) [USA]
General Motors, Factory ZERO (Detroit-Hamtramck Plant) EV GMC Hummer (2021-), EV Hummer SUV (2023-), EV Cruise Origin shuttle (2023-, halted through 2024), Chevrolet Silverado EV (2024-), GMC Sierra EV (2024-), Cadillac Escalade IQ (2024-), Cadillac Escalade IQL (2025-); EV battery pack modules (2023-); Chevrolet PHV Volt (2010-2019) / Opel PHV Ampera (2011-2014); Chevrolet Malibu (2012-2016), Impala (2013-2020); Cadillac ELR (2013-2016), CT6 ...
OEM Plants Updated at: 2025/06/13
LG Energy Solution, Lansing Plant[USA]
oyees capable of building 41 GWh of EV batteries per year. The Ultium Cells Lansing plant will be in close proximity to supply the GM Lansing Grand River, Lansing Delta Township and GM Factory Zero plants with EV batteries to produce models including the GMC Hummer EV Pickup, GMC Hummer EV SUV, GMC Sierra EV, and Chevrolet Silverado EV. GM’s Q4 2023 earnings report revealed that full production has been achieved at the Ultium Cells plant in War...
OEM Plants Updated at: 2025/06/11
General Motors, Toledo Propulsion Systems (formerly Toledo Transmission Plant)[USA]
repare the facility for future engine casting components work. On February 4, General Motors announced it will invest USD 75 million in its Toledo Transmission Plant in Ohio to increase the plant’s capacity to build 10-speed automatic transmissions that are used in the Chevrolet Silverado and GMC Sierra. The plant’s 1,700 employees currently build GM’s six-speed, eight-speed, and 10-speed rear-wheel-drive and nine-speed front-wheel-drive tr...
OEM Plants Updated at: 2025/06/10
General Motors, Lansing Grand River Assembly / Stamping Plant[USA]
nd Chevrolet Equinox downtime through the week of October 11. On October 25, GM confirmed it will have Saturday overtime shifts at six North American plants in November as it works itself through the global semiconductor shortage, including Fort Wayne and Silao Assembly (Chevrolet Silverado and GMC Sierra trucks), Wentzville Assembly, (GMC Canyon and Chevrolet Colorado), Lansing Grand River Assembly (Cadillac CT4 and CT5, and Chevrolet Camaro), L...
OEM Plants Updated at: 2025/06/05
General Motors, Flint Assembly Plant[USA]
General Motors, Flint Assembly Plant Chevrolet Silverado 2500/3500HD, Silverado HD ZR2 (2023-), Silverado HD ZR2 Bison (2023-); GMC Sierra 2500/3500HD; Chevrolet Silverado 4500/5500/6500HD (2018-) GM's Flint truck assembly plant in Michigan Year opened: 1947 Announced investment since 2014: over USD 1.9 billion Employees as of October 2024: 4,524 General Motors to add 220 jobs, retain 680 in Michigan General Motors plans four-week July shutdown ...
OEM Plants Updated at: 2025/06/05